Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Ford, D N (2002) Achieving Multiple Project Objectives through Contingency Management. Journal of Construction Engineering and Management, 128(01), 30–39.

Haas, C and Einstein, H H (2002) Updating the Decision Aids for Tunneling. Journal of Construction Engineering and Management, 128(01), 40–48.

Hanna, A S, Camlic, R, Peterson, P A and Nordheim, E V (2002) Quantitative Definition of Projects Impacted by Change Orders. Journal of Construction Engineering and Management, 128(01), 57–64.

Jaselskis, E J, Kurtenbach, J M and Forrest, J (2002) Enhancing Financial Success Among Electrical Contractors. Journal of Construction Engineering and Management, 128(01), 65–75.

Lee, E, Roesler, J, Harvey, J T and Ibbs, C W (2002) Case Study of Urban Concrete Pavement Reconstruction on Interstate 10. Journal of Construction Engineering and Management, 128(01), 49–56.

Love, P E D (2002) Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects. Journal of Construction Engineering and Management, 128(01), 18–29.

McCabe, B, AbouRizk, S and Gavin, J (2002) Time of Sampling Strategies for Asphalt Pavement Quality Assurance. Journal of Construction Engineering and Management, 128(01), 85–89.

Thomas, H R (2002) 2000 Peurifoy Lecture: Construction Practices in Developing Countries. Journal of Construction Engineering and Management, 128(01), 1–7.

Wang, W (2002) SIM-UTILITY: Model for Project Ceiling Price Determination. Journal of Construction Engineering and Management, 128(01), 76–84.

Yates, J K and Lockley, E E (2002) Documenting and Analyzing Construction Failures. Journal of Construction Engineering and Management, 128(01), 8–17.